Riyadh–Qassim · IWTP

Transient analysis, surge equipment design and vent-and-drain calculations across three major water transmission routes.

Understanding a multi-corridor network.
AI-generated illustration · not a project photograph

The challenge

The network combines pumped and gravity transmission from HPT-2 to Ghanman with long pumped routes to Buraydah and Al Quarna. Multiple supply nodes and route lengths require a system-wide understanding of transient behaviour.

Our contribution

Pipelab performs bid-stage transient hydraulic studies and surge equipment design for the 139 km HPT-2–Ghanman route, the 336 km Ghanman–Buraydah route and the 384 km Ghanman–Al Quarna route. Vent and drain calculations cover all pipeline sections.

Engineering outcome

The engineering supports the bid-stage definition of hydraulic protection and operating requirements across a strategic network serving the central region.

139 / 336 / 384km · three assessed routes
685,000m³/day · HPT-2–Ghanman design capacity
480,000 / 390,000m³/day · Buraydah / Al Quarna routes

Figures describe the project’s design scale, not measured operating results.

Next project

Hadda & Arana · TSE Facilities

Start a conversation

Your next challenge.
Our next conversation.

Discuss your project
Pipelab GmbH · Swiss Headquarters

Zurich

Technoparkstrasse 1
8005 Zurich
Switzerland

Pipelab Middle East · Subsidiary

Riyadh

Servcorp · Olaya Towers, B, L25&28
Olaya St / Mohammed bin Abdul-Aziz St
Riyadh, Saudi Arabia

www.pipelabarabia.com
Direct contact

Contact

info@pipelab.ch
+41 78 716 22 03

↑