Complete pre-bid engineering for treated sewage effluent pumping, transmission, storage and tanker filling facilities.

Bladder-type surge vessels with connected elbow pipes and flanged connections, with subtle blue visual effects.
Bladder Vessel · Site photograph · AI-enhanced

The challenge

The Hadda and Arana special facilities connect treated wastewater sources with agricultural reuse. The project combines new pumping stations, large-diameter GRP pipelines, storage tanks, metering shafts and tanker filling stations.

Our contribution

Pipelab carried out complete pre-bid design for all disciplines, with civil and electrical engineering subcontracted. The Arana facilities include approximately 42.6 km of pipelines up to DN2000 and 50,000 m³ of storage. Hadda includes approximately 38.3 km of pipelines up to DN1800 and 20,000 m³ of storage.

Engineering outcome

The tender design supports the reuse of treated effluent for irrigation, integrating the facilities needed to convey, store and distribute reclaimed water.

42.6 / 38.3 kmArana / Hadda pipelines
DN2000 / DN1800maximum pipeline sizes
50,000 / 20,000m³ · Arana / Hadda storage

Figures describe the project’s design scale, not measured operating results.

Next project

Shoaiba–Quaiza B

Start a conversation

Your next challenge.
Our next conversation.

Discuss your project
Pipelab GmbH · Swiss Headquarters

Zurich

Technoparkstrasse 1
8005 Zurich
Switzerland

Pipelab Middle East · Subsidiary

Riyadh

Servcorp · Olaya Towers, B, L25&28
Olaya St / Mohammed bin Abdul-Aziz St
Riyadh, Saudi Arabia

www.pipelabarabia.com
Direct contact

Contact

info@pipelab.ch
+41 78 716 22 03

↑