Ras Al Khair–Riyadh

Station engineering for a twin-pipeline system designed to transport 1.2 million cubic metres of potable water per day.

Ras Al Khair surge vessel plant: a row of horizontal vessels and blue outlet piping, with subtle blue digital highlights.
Surge vessel plant · Site photograph © MAPA · AI-enhanced

The challenge

Conveying desalinated water over approximately 360 km requires coordinated pumping, storage and tie-in facilities. The H&I Phase 2 project combines twin 88-inch transmission pipelines with three large pumping stations and extensive tank farms.

Our contribution

Pipelab’s station-lot scope covers process and mechanical final design, with civil engineering delivered through a subcontracted discipline. The design addresses pumping arrangements, station piping and integration with existing supply and storage infrastructure.

Engineering outcome

The design supports the expansion of the Ras Al Khair–Riyadh water corridor, with two lines each designed for 600,000 m³/day. Integration provisions connect new facilities with existing HPT1 assets and future network interfaces.

2 × 600,000m³/day · system design capacity
88″twin transmission pipelines
3major pumping stations

Figures describe the project’s design scale, not measured operating results.

Next project

New Satellite Plants · Phase 2

Start a conversation

Your next challenge.
Our next conversation.

Discuss your project
Pipelab GmbH · Swiss Headquarters

Zurich

Technoparkstrasse 1
8005 Zurich
Switzerland

Pipelab Middle East · Subsidiary

Riyadh

Servcorp · Olaya Towers, B, L25&28
Olaya St / Mohammed bin Abdul-Aziz St
Riyadh, Saudi Arabia

www.pipelabarabia.com
Direct contact

Contact

info@pipelab.ch
+41 78 716 22 03

↑