Ras Al Khair–Riyadh
Station engineering for a twin-pipeline system designed to transport 1.2 million cubic metres of potable water per day.

The challenge
Conveying desalinated water over approximately 360 km requires coordinated pumping, storage and tie-in facilities. The H&I Phase 2 project combines twin 88-inch transmission pipelines with three large pumping stations and extensive tank farms.
Our contribution
Pipelab’s station-lot scope covers process and mechanical final design, with civil engineering delivered through a subcontracted discipline. The design addresses pumping arrangements, station piping and integration with existing supply and storage infrastructure.
Engineering outcome
The design supports the expansion of the Ras Al Khair–Riyadh water corridor, with two lines each designed for 600,000 m³/day. Integration provisions connect new facilities with existing HPT1 assets and future network interfaces.
Figures describe the project’s design scale, not measured operating results.
New Satellite Plants · Phase 2
Your next challenge.
Our next conversation.
Discuss your projectZurich
Technoparkstrasse 1
8005 Zurich
Switzerland
Riyadh
Servcorp · Olaya Towers, B, L25&28
Olaya St / Mohammed bin Abdul-Aziz St
Riyadh, Saudi Arabia