PIPELAB · Projects

Abha · AM2bWTS

A gravity transmission extension integrating new storage, existing reservoirs and future interconnections in the Abha metropolitan region.

Pipeline installation in an excavated trench with site workers and construction vehicles, with subtle blue digital highlights.
Pipeline trench · Photo courtesy RTCC · AI-enhanced

The challenge

Extending an operating water network requires more than new pipelines. The Abha Phase 2 extension integrates multiple tie-ins and tap-offs, new storage, emergency reverse-flow connections and provisions for future network growth.

Our contribution

Pipelab provides complete final design, with civil and electrical lots subcontracted. The scope includes a 25.1 km gravity transmission pipeline, two 30,000 m³ steel storage tanks at Military City and connections to existing reservoirs and supply corridors.

Engineering outcome

The design supports greater storage capacity, operational flexibility and future interconnection. Emergency connections and bypass arrangements provide additional options for managing regional water supply.

25.1 kmgravity transmission pipeline
2 × 30,000m³ · Military City storage
48″–36″main transmission diameters

Figures describe the project’s design scale, not measured operating results.

Next project

Al Haer · ISTP

Start a conversation

Your next challenge.
Our next conversation.

Discuss your project
Pipelab GmbH · Swiss Headquarters

Zurich

Technoparkstrasse 1
8005 Zurich
Switzerland

Pipelab Middle East · Subsidiary

Riyadh

Servcorp · Olaya Towers, B, L25&28
Olaya St / Mohammed bin Abdul-Aziz St
Riyadh, Saudi Arabia

www.pipelabarabia.com
Direct contact

Contact

info@pipelab.ch
+41 78 716 22 03

↑